Skip to Main Content
Menu
Contact Us

Project: City of Williams - Water System Improvements Project

Description: The City construction project will consist of Well no. 8 site installing a manganese filtration system, backwash tank, extension of filter control building to house filter control, valves, modifications to the existing well system piping, a new permanent generator, an automatic transfer switch (ATS) and SCADA improvements. Well no. 9 will include a permanent emergency generator, ATS, a variable frequency drive (VFD), flow-paced chemical dosing pumps, and SCADA improvements. Well no. 10 will include a VFD, flow-paced chemical dosing pumps, and SCADA improvements. Additional components will include AMI meter installation.

Reference Number: 3940P68D1902041

Implemented By: City of Williams

Objective:

Type: Infrastructure Improvement

Total Cost: $5,000,000.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 3/1/2023    Actual Completion:

Associated Counties: Colusa

Located In Severely Disadvantaged Community: Yes

Contribution SourcesContribution DateContribution Amount
  $5,000,000.00
Other State Funds4/22/2020$472,900.00
Prop. 68, Water Quality/Safe Drinking Water Program6/8/2021$4,527,100.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementOther  

Location

loading loading