Project: San Luis Obispo County Proposition 1E Proposal - Flood Control Zone 1/1A Waterway Management Program, Alternative 3a Project

Description: The Project includes the following key project elements: 1) Manage riparian vegetation annually to improve flood capacity; 2) Support a continuous canopy cover of mature trees and fill existing gaps while encouraging species diversity; 3) Conduct sediment management in a way that will improve flood capacity and enhance geomorphic function so as to minimize future sediment accumulations that require intensive management; and 4) Raise levees throughout the flood control channel to ultimately achieve a channel capacity that will protect the adjacent community and farmland up to a 10 year flood event.

Reference Number: 3860-P1E-365

Implemented By: San Luis Obispo County Flood Control & Water Conservation District

Objective: Manage stormwater runoff to reduce flood damage and where feasible, provide other benefits, including groundwater recharge, water quality improvement, and ecosystem restoration.

Type: Water Management

Total Cost: $5,733,760.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2021    Actual Completion:

Associated Counties: San Luis Obispo



Contribution SourcesContribution DateContribution Amount
  $5,733,760.00
Local Contribution6/2/2021$2,936,760.00
Prop. 1E, Stormwater/Flood Management12/21/2011$2,797,000.00


Project MetricMetric TopicQuantityUnit
Water ManagementStormwater Flood / Capture  