Project: FY 09-10 Aqueduct Project (RD 2024) - Orwood & Palm Tract OP 10-1

Description: Improve levees at two areas including Design & construction: 1) 7,400 ft (1.4 mi) improving slopes to PL 84-99 standard including. 2) 5,500 ft.(1.1 mi) slope improvements of PL 84-99 stability berm.

Reference Number: 3860-P1E-233

Implemented By: Reclamation District 2024 Orwood-Palm Tract

Objective: Reinforce sections of levees that have the highest potential to suffer breaches or failure and cause harm to municipal and industrial water supply aqueducts that cross the Delta.

Type: Infrastructure Improvement

Total Cost: $3,093,864.00

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: No

Estimated Completion: 6/30/2013    Actual Completion: 10/31/2012

Associated Counties: Contra Costa



Contribution SourcesContribution DateContribution Amount
  $3,093,864.00
Local Contribution10/13/2011$464,080.00
Prop. 1E, Delta Levees System Integrity Program9/7/2010$2,629,784.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementLevee Repair, Strengthen, Raised2.29miles of levee repaired/strengthened