Skip to Main Content
Menu
Contact Us

Project: WSAFCA-EIP-CO West Sacramento

Description: Design and construct four early implementation project segments of the West Sacramento Project for the West Sacramento Flood Control Agency (WSAFCA). The North Basin project includes Reach 6, the CHP Academy Site; Reach 8, the I Street Bridge Site and Reach 7B Bryte Park Site. The South Basin Project includes a stretch of levee from Station 0+00 to 300+00. This site is located on the right (west) bank of the Sacramento River, downstream of the confluence with the Barge Canal. Project limits are designated as Station 0+00 to 300+00. Total project amount includes State support costs for project implementation.

Reference Number: 3860-PM-971

Implemented By: West Sacramento Area Flood Control Agency (WSAFCA)

Objective: To provide 200 year flood protection for the West Sacramento area.

Type: Acquisition Easement, Acquisition Fee Title, Restoration, Infrastructure Improvement

Total Cost: $250,309,693.99

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 6/30/2022    Actual Completion:

Associated Counties: Yolo

Located In Severely Disadvantaged Community: Yes

Contribution SourcesContribution DateContribution Amount
  $250,309,693.99
Local Contribution1/31/2014$67,154,785.50
Prop. 1E, Early Implementation Program (EIP)5/22/2019$183,154,908.49


Project MetricMetric TopicQuantityUnit
Acquisition EasementFlood Control/Protection Corridor15acres acquired
Acquisition Fee TitleFlood Control/Protection Corridor400acres acquired
RestorationEcosystem: Riparian Habitat120acres restored/assessed/managed
Infrastructure ImprovementLevee Repair, Strengthen, Raised0.1miles of levee repaired/strengthened
Infrastructure ImprovementNew Levee Construction4miles of levee constructed

Location

loading loading