Project: SAFCA-NCC-EIP- Natomas Levee Improvement Project

Description: Funding was provided for the Natomas Cross Canal South Levee Phase 1 & 2 for improvements for 5.5 miles of levee and financing an Early Implementation Program project. The project improves the level of flood protection to 200 year level of protection for the Natomas Basin perimeter levee system located north of Sacramento. The project entails improving the levee system by constructing cutoff walls and levee strengthening and reshaping features.

Reference Number: 3860-PM-016

Implemented By: Sacramento Area Flood Control Agency (SAFCA)

Objective: The goal of the Natomas Levee Improvement Program Natomas Cross Canal (NCC) Project is to provide 200 year flood protection to residents, structures and property within the Natomas Basin resulting in reduced flood risk, minimize State liability, and improve maintenance efficiency.

Type: Acquisition Easement, Acquisition Fee Title, Restoration, Infrastructure Improvement

Total Cost: $65,059,127.24

Project Status: Complete but Not Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 6/30/2023    Actual Completion:

Associated Counties: Sacramento, Sutter



Contribution SourcesContribution DateContribution Amount
  $65,059,127.24
Local Contribution7/1/2007$17,000,000.00
Prop. 84, Early Implementation Program (EIP)11/22/2016$40,183,549.00
Prop. 1E, Early Implementation Program (EIP)6/8/2017$7,875,578.24


Project MetricMetric TopicQuantityUnit
Acquisition EasementFlood Control/Protection Corridor19.87acres acquired
Acquisition Fee TitleFlood Control/Protection Corridor79.2acres acquired
RestorationEcosystem: Riparian Habitat0acres restored/assessed/managed
Infrastructure ImprovementLevee Repair, Strengthen, Raised5.5miles of levee repaired/strengthened