Project: RD 38 Staten Island ST-19-1- SP Delta project

Description: RD 38 Staten Island ST-19-1- SP Delta project: Phase 1: Project will cover engineering and design of levee improvement and rehabilitation, and habitat improvement, of approximately 16,000 lineal feet of District levee to sustainably meet the Delta Specific PL84-99 standard, and seven setback levees and riparian habitat benches where the levee is experiencing erosion below the normal water line, along the North Fork Mokelumne River corridor from Stations 1040+00 to 1200+00. ( $ 2.1 million) Phase 2: Construction and the implementation of this project. (@ $9 million)

Reference Number: 3860-PM-1586

Implemented By: Reclamation District 38 Staten Island

Objective: Delta Flood Protection Activities - Design, Engineering & Construction of Urgent Levee Rehabilitation and Enhancement Project. - RD 38 Staten Island ST-19-1- SP Delta project (Special Projects - Directed Action Levee Improvement projects 2019)

Type: Infrastructure Improvement

Total Cost: $11,631,550.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2023    Actual Completion:

Associated Counties: San Joaquin

Located In Disadvantaged Community: No

Contribution SourcesContribution DateContribution Amount
  $11,631,550.00
Local Contribution6/18/2020$1,131,550.00
Prop. 84, Delta Levees System Integrity Program6/18/2020$3,700,000.00
Prop. 1, Reduce the risk of levee failure and flood in the Delta5/18/2021$6,800,000.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementLevee Repair, Strengthen, Raised3.03miles of levee repaired/strengthened

Water Action Plan Target

    
Achieve the Co-Equal Goals for the DeltaAction Description
Increase Flood ProtectionAction Description