Project: RD 2028 Bacon Island BN-19-1-SP Delta project

Description: RD 2028 Bacon Island BN-19-1-SP Delta project: Phase 1: Planning portion of the Project will cover engineering and design of levee improvement and rehabilitation, and habitat improvement, and activities which will consist at the District levees from Stations 200+00 to 300+00 along Connection Slough and 625+00 to 707+00 along Santa Fe Cut. ($1,965,550) Phase 2: Construction and the implementation of this project. (estimated $9 million)

Reference Number: 3860-PM-1584

Implemented By: Reclamation District 2028 Bacon Island

Objective: Delta Flood Protection Activities - Design, Engineering & Construction of Urgent Levee Rehabilitation and Enhancement Project. - RD 2028 Bacon Island BN-19-1-SP Delta project (Special Projects - Directed Action Levee Improvement projects 2019)

Type: Infrastructure Improvement

Total Cost: $10,010,803.33

Project Status: Preliminary/Planning

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2023    Actual Completion:

Associated Counties: San Joaquin

Located In Disadvantaged Community: No

Contribution SourcesContribution DateContribution Amount
  $10,010,803.33
Local Contribution6/18/2020$10,803.33
Prop. 84, Delta Levees System Integrity Program6/18/2020$1,000,000.00
Prop. 1, Reduce the risk of levee failure and flood in the Delta5/18/2021$9,000,000.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementLevee Repair, Strengthen, Raised3.45miles of levee repaired/strengthened

Water Action Plan Target

    
Achieve the Co-Equal Goals for the DeltaAction Description
Increase Flood ProtectionAction Description