Project: RD 756 Bouldin Island BO-19-1-SP Delta project

Description: RD 756 Bouldin Island BO-19-1-SP Delta project: Phase 1: Project will cover engineering and design of levee improvement and rehabilitation, and habitat improvement, and activities which will consist at the District levees from Stations 665+00 to 726+00 and 781+00 to 946+77 along the South Mokelumne River corridor. ($2. 4 million) Phase 2: Construction and the implementation of this project. (@ $9 million)

Reference Number: 3860-PM-1585

Implemented By: Reclamation District 756 Bouldin Island

Objective: Delta Flood Protection Activities - Design, Engineering & Construction of Urgent Levee Rehabilitation and Enhancement Project. - RD 756 Bouldin Island BO-19-1-SP Delta project (Special Projects - Directed Action Levee Improvement projects 2019)

Type: Infrastructure Improvement

Total Cost: $12,903,225.81

Project Status: Preliminary/Planning

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2023    Actual Completion:

Associated Counties: San Joaquin

Located In Disadvantaged Community: No

Contribution SourcesContribution DateContribution Amount
  $12,903,225.81
Local Contribution6/17/2020$903,225.81
Prop. 84, Delta Levees System Integrity Program6/17/2020$5,200,000.00
Prop. 1, Reduce the risk of levee failure and flood in the Delta5/18/2021$6,800,000.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementLevee Repair, Strengthen, Raised4.29miles of levee repaired/strengthened