Skip to Main Content
Menu
Contact Us

Project: San Joaquin River Basin, Lower San Joaquin California River Project

Description: Preconstruction Engineering and Design (PED) for the USACE who plans to construct 24 miles of levee improvements and 2 closure structures, one at Fourteenmile Slough and the other at Smith Canal.

Reference Number: 3860-P1E-971

Implemented By: Department of Water Resources

Objective: Is to complete the Preconstruction Engineering and Design (PED) for one or two of the reaches along the 24 miles of levee improvements

Type: Infrastructure Improvement

Total Cost: $6,478,422.96

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2032    Actual Completion:

Associated Counties: San Joaquin



Contribution SourcesContribution DateContribution Amount
  $6,478,422.96
Federal Contribution4/26/2019$4,125,000.00
Local Contribution5/15/2019$526,096.01
Prop. 1E, USACE Projects9/14/2018$1,827,326.95


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementLevee Repair, Strengthen, Raised40miles of levee repaired/strengthened

Location

loading loading