Project: Northwest Levee Improvement and Stone Road Levee Seepage Project (BI-17-1.0-SP), District BIMID Bethel Island

Description: The proposed project will improve 24,000 feet (4.55 miles) of levee, between Stations 0+00 and 130+00 along Taylor Slough, and Stations 340+00 and 450+00 along Dutch and Sand Mound Sloughs. The work along Taylor Slough will be based on the Bulletin 192-82 template, and will consist of the placement landside fill, levee crown raising, and some waterside slope revetment. The work along Dutch and Sand Mound Sloughs will consist of the installation of landside toe drains to address seepage issues. The project will also include the establishment of 4,500 feet of habitat enhancement, consisting of shaded riverine aquatic on the waterside, and scrub shrub and riparian forest on the landside.

Reference Number: 3860-PM-969

Implemented By: Reclamation District BIMID / Bethel Island

Objective: The proposed project will improve 24,000 feet (4.55 miles) of levee, between Stations 0+00 and 130+00 along Taylor Slough, and Stations 340+00 and 450+00 along Dutch and Sand Mound Sloughs. The work along Taylor Slough will be based on the Bulletin 192-82 template, and will consist of the placement landside fill, levee crown raising, and some waterside slope revetment. The work along Dutch and Sand Mound Sloughs will consist of the installation of landside toe drains to address seepage issues.

Type: Restoration, Infrastructure Improvement

Total Cost: $9,726,239.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 4/12/2023    Actual Completion:

Associated Counties: Contra Costa

Project Benefits a Disadvantaged Community (or SDAC): Yes

Contribution SourcesContribution DateContribution Amount
  $9,726,239.00
Local Contribution4/25/2018$636,295.00
Prop. 84, Delta Levees System Integrity Program2/14/2019$5,452,968.00
Prop. 1E, Delta Levees System Integrity Program4/25/2018$1,776,975.00
Prop. 1, Reduce the risk of levee failure and flood in the Delta5/18/2021$1,860,001.00


Project MetricMetric TopicQuantityUnit
Restoration   
Infrastructure Improvement   

Water Action Plan Target

    
Achieve the Co-Equal Goals for the DeltaAction Description
Increase Flood ProtectionAction Description

Location

loading loading