Project: Reclamation District 2072 Multi Benefit Project (WD-17-1.0-SP), RD 2072 Woodward Island

Description: The proposed project will improve 25,500 feet (4.83 miles) of levee, at various locations between Stations 35+00 and 468+00, including locations along Old and Middle Rivers. The work will be based on the Bulletin 192-82 template, consisting primarily of the placement landside fill, with some levee crown raising. The project will also include the establishment of 1,000 feet of waterside habitat enhancement consisting of shaded riverine aquatic.

Reference Number: 3860-PM-967

Implemented By: RD 2072 - Woodward Island, RD 2072 Woodward Island

Objective: The proposed project will improve 25,500 feet (4.83 miles) of levee, at various locations between Stations 35+00 and 468+00, including locations along Old and Middle Rivers. The work will be based on the Bulletin 192-82 template, consisting primarily of the placement landside fill, with some levee crown raising.

Type: Restoration, Infrastructure Improvement

Total Cost: $6,099,411.59

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 4/12/2023    Actual Completion:

Associated Counties: San Joaquin



Contribution SourcesContribution DateContribution Amount
  $6,099,411.59
Local Contribution4/25/2018$914,911.59
Prop. 84, Delta Levees System Integrity Program2/14/2019$3,414,249.00
Prop. 1E, Delta Levees System Integrity Program4/25/2018$1,770,251.00


Project MetricMetric TopicQuantityUnit
RestorationLevee Habitat Enhancement0.023acres restored/assessed/managed
Infrastructure ImprovementLevee Repair, Strengthen, Raised0.189miles of levee repaired/strengthened