Project: Lakeside Joint SD Water Supply - Construction Project

Description: The school is finishing up the planning phase and needs to complete the DWSRF construction application.SWRCB funded water supply project for Lakeside School which replaces components of the existing water system with new components of essentially the same capacity and located in the same area. A new well approximately 10 gpm replaces an old well that does not meet the drinking water standards. A deteriorated 10,000 gallon steel tank is replaced by a new 10,000 gallon HDPE tank. Approximately 250 ft of 2-inch waterline, electrical conduit, and cables will be constructed.

Reference Number: 3940P01D1702031

Implemented By: Lakeside Joint School District

Objective: Replacement of groundwater well, storage tank, water distribution lines, and related appurtenances for the Lakeside School.

Type: Infrastructure Improvement

Total Cost: $1,598,360.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 10/1/2022    Actual Completion:

Associated Counties: Santa Clara

Project Benefits a Disadvantaged Community (or SDAC): Yes

Contribution SourcesContribution DateContribution Amount
  $1,598,360.00
Prop. 1, Water System Infrastructure Improvements - Safe Drinking Water10/29/2018$1,598,360.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementWater Quality Infrastructure  

Water Action Plan Target

    
Provide Safe Water for All CommunitiesAction Description

Location