Project: City of Anaheim - Modjeska Park Stormwater Construction Project

Description: "The proposed project will utilize the footprint of an existing 37,000 SF parking lot to capture and infiltrate approximately 182 acre feet of dry weather urban runoff and first flush storm water into the City's groundwater each year. This is water that would otherwise flow untreated to the Bolsa Chica Channel and eventually to the Pacific Ocean. The City will remove existing asphalt concrete (AC) pavement, install an underground, pre-cast infiltration/retention facility and larger storm water pipes, and repave the lot utilizing pervious surfaces. The proposed system will allow water that flows into the Watershed to instead percolate into the groundwater, removing pollutants. Signage will educate over 4,000 monthly park visitors about methods to reduce storm water pollution."

Reference Number: 3940P01D1712673

Implemented By: City of Anaheim

Objective: This grant is for the purpose of capturing and infiltrating dry weather urban runoff and first flush storm water to reduce pollutant discharges to the Bolsa Chica Channel.

Type: Infrastructure Improvement

Total Cost: $3,458,036.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 3/31/2021    Actual Completion:

Associated Counties: Orange

Project Benefits a Disadvantaged Community (or SDAC): No

Contribution SourcesContribution DateContribution Amount
  $3,458,036.00
Private Contribution6/6/2019$1,834,018.00
Prop. 1, Multibenefit Stormwater Management Projects1/31/2018$1,624,018.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementOther  

Water Action Plan Target

    
Increase Regional Self-Reliance and Integrated Water Management Across All Levels of GovernmentAction Description