Project: Tract 349 MWC New Water Well (Site 2) - Construction Project

Description: The project location will be at Florence Well Site, in the north-west corner of Florence Ave and Salt Lake Ave. Installation of a new well will be within the same site area as existing Well No. 2. The project will remove Well No. 2 from service due to aged infrastructure being unreliable and affecting water quality. The construction of one municipal water well consist of drilling the well pilot hole, formation testing, installation of 18-inch diameter stainless steel casing, all necessary yard piping, and a vertical turbine pump with a capacity of 1,000 GPM and 125 HP motor. The existing sodium hypochlorite metering pump and tank will be relocated to a chemical storage building. Also, an emergency generator and fuel tank will be incorporated into the project (Per approved Plans & Specifications).

Reference Number: 3940P01D1702034

Implemented By: Tract 349, Mutual Water Company

Objective: The project will remove Well No. 2 from service. The construction of one municipal water well consist of drilling the well pilot hole, formation testing, installation of 18-inch diameter stainless steel casing, all necessary yard piping, and a pump.

Type: Infrastructure Improvement

Total Cost: $3,399,231.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 9/30/2021    Actual Completion:

Associated Counties: Los Angeles

Project Benefits a Disadvantaged Community (or SDAC): Yes

Contribution SourcesContribution DateContribution Amount
  $3,399,231.00
Prop. 1, Water System Infrastructure Improvements - Safe Drinking Water7/8/2019$3,399,231.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementWater Quality Infrastructure  

Water Action Plan Target

    
Provide Safe Water for All CommunitiesAction Description