Skip to Main Content
Menu
Contact Us

Project: 2015 LLCR, Zone 3A Line D

Description: The improvements project will remediate a portion of the Zone 3A Line D levee system. It is along the West and East Bank, between Huntwood Ave and Bay Area Rapid Transit (BART) with total length of 3,020 feet (0.57 miles) of levee.

Reference Number: 3860-P84-1537

Implemented By: Alameda County Flood Control and Water Conservation District

Objective: The improvements project will remediate the portion of the Zone 3A Line D levee system, along the West and East Bank, between Huntwood Ave and BART, which the combined total length of levee, under this project, is 3,020 feet (0.57 miles) for both the West and East Banks of Zone 3A Line D.

Type: Restoration, Infrastructure Improvement

Total Cost: $2,935,141.12

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2018    Actual Completion: 12/31/2019

Associated Counties: Alameda

Located In Disadvantaged Community: No

Contribution SourcesContribution DateContribution Amount
  $2,935,141.12
Local Contribution8/2/2017$1,443,515.00
Prop. 84, Local Levee Assistance Program6/4/2018$1,491,626.12


Project MetricMetric TopicQuantityUnit
Restoration   
Infrastructure Improvement   

Location

loading loading