Project: 2015 LLCR, Zone 2 Line A

Description: The project will remediate a portion of the Estudillo Canal levee system, along the North Bank. It’s between the mouth of San Francisco Bay and Union Pacific Railroad, with total length of 3,460 feet (0.66 miles).

Reference Number: 3860-P84-1536

Implemented By: Alameda County Flood Control and Water Conservation District

Objective: The improvements project will remediate the portion of the Estudillo Canal levee system, along the North Bank, between the mouth of San Francisco Bay and Union Pacific Railroad, which the total length of levee, under this project, is 3,460 feet (0.66 miles) for North Bank of Estudillo Canal.

Type: Restoration, Infrastructure Improvement

Total Cost: $3,662,342.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2019    Actual Completion:

Associated Counties: Alameda

Located In Disadvantaged Community: No

Contribution SourcesContribution DateContribution Amount
  $3,662,342.00
Local Contribution8/2/2017$1,779,620.00
Prop. 84, Local Levee Assistance Program6/4/2018$1,882,722.00


Project MetricMetric TopicQuantityUnit
Restoration   
Infrastructure Improvement   