Project: Shasta Community Services District Tanks/Pump Stations Replacement - Construction Project

Description: The water system has eleven storage tanks; eight of them are in poor conditions. These eight tanks are located in four different pressure zones, Record Heights, Middle Brunswick, Upper Brunswick, and Highland Circle. The tanks will be replaced with an adequate size welded steel tank for each pressure zone. Four pump stations at each pressure zone will be upgraded to meet the current codes. Finally, the 1,600 feet of the 8-inch cast iron mainline will be replaced with 12-inc ductile iron pipe.

Reference Number: 3940P01D1602060

Implemented By: Shasta Community Services District

Objective: Replace existing storage tanks and expand storage capacity to meet water demand and fire flow

Type: Infrastructure Improvement

Total Cost: $5,000,000.00

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 9/1/2019    Actual Completion:

Associated Counties: Shasta

Project Benefits a Disadvantaged Community (or SDAC): Yes

Contribution SourcesContribution DateContribution Amount
  $5,000,000.00
Prop. 1, Water System Infrastructure Improvements - Safe Drinking Water1/3/2018$5,000,000.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementOther  

Water Action Plan Target

    
Expand Water Storage Capacity and Improve Groundwater ManagementAction Description