Project: Friant-Kern Canal & 8-23 Canal Intertie Pipeline

Description: This project constructs an intertie pipeline and pumping facility to replace an unlined conveyance route and capture surplus unallocated floodwater. A 36” pipeline and pumping facility will be constructed to connect the Friant-Kern Canal (FKC) with the 8-23 Canal Intertie (Project) and provide a path of water conveyance from the District to the FKC. The construction of this pipeline will eliminate the loss of surface water due to seepage (which is estimated to be 11% of the water to be conveyed to the FKC) from the unlined canal and provide a shorter, piped route. A vaulted bidirectional flowmeter with totalizer will record the flow volumes and determine the efficacy of the Project. This project includes final design, environmental compliance and permits, contracting, and labor compliance. Grant funds will be used for a portion of construction activities and equipment costs.

Reference Number: 3860-P01-121

Implemented By: Cawelo Water District

Objective:

Type: Infrastructure Improvement, Water Management

Total Cost: $6,983,805.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2021    Actual Completion:

Associated Counties: Kern

Project Benefits a Disadvantaged Community (or SDAC): No

Contribution SourcesContribution DateContribution Amount
  $6,983,805.00
Local Contribution1/13/2017$3,983,805.00
Prop. 1, Water Conservation and Water Use Efficiency Plans, Projects, and Programs1/13/2017$3,000,000.00


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementOther  
Water ManagementConveyance  
Water ManagementWater Use Efficiency - Conservation  

Water Action Plan Target

    
Make Conservation a California Way of LifeAction Description
Increase Regional Self-Reliance and Integrated Water Management Across All Levels of GovernmentAction Description

Location

loading loading