Project: Pioneer Union School District-Mountain Creek School Water Tank Replacement

Description: The existing redwood storage tank has been cited for a bad BAC-T test in the past and is at high risk for a future reoccurrence. The tank also leaks consistently due to the age and material of the structure. The reliability and safety of the existing storage tank have made it no longer practical to maintain. The project si to replace the redwood tank with a steel tank, of the same size and in the same location and site will be retrofited with a booster station, control panels, and a disinfection system.

Reference Number: 3940P01D1502045

Implemented By: Pioneer Union School District

Objective: Replace the redwood tank with a steel tank

Type: Infrastructure Improvement

Total Cost: $410,749.02

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 9/1/2019    Actual Completion: 12/31/2019

Associated Counties: El Dorado

Project Benefits a Disadvantaged Community (or SDAC): Yes

Contribution SourcesContribution DateContribution Amount
  $410,749.02
Prop. 1, Water System Infrastructure Improvements - Safe Drinking Water5/17/2021$410,749.02


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementWater Quality Infrastructure  

Water Action Plan Target

    
Provide Safe Water for All CommunitiesAction Description