Skip to Main Content
Menu
Contact Us

Project: WSAFCA Construction

Description: Construct the Southport setback levee tie-ins and improvement of existing levees adjacent to the South Port Setback Project (previously partially funded as an EIP Project). Total project amount includes State support costs for project implementation.

Reference Number: 3860-P1E-896

Implemented By: West Sacramento Area Flood Control Agency (WSAFCA)

Objective: Flood Protection

Type: Acquisition Easement, Acquisition Fee Title, Infrastructure Improvement

Total Cost: $13,944,461.36

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 6/30/2022    Actual Completion:

Associated Counties: Sacramento



Contribution SourcesContribution DateContribution Amount
  $13,944,461.36
Local Contribution7/8/2015$11,220,000.00
Prop. 1E, Urban Flood Risk Reduction Program7/8/2015$2,724,461.36


Project MetricMetric TopicQuantityUnit
Acquisition EasementFlood Control/Protection Corridor45acres acquired
Acquisition Fee TitleFlood Control/Protection Corridor20acres acquired
Infrastructure ImprovementLevee Repair, Strengthen, Raised1.5miles of levee repaired/strengthened

Location

loading loading