Skip to Main Content
Menu
Contact Us
Natural Resources Agency

Project: CABY: Lincoln Metering and Hydroelectric Stations

Description: Install two turbine generators within an existing pressure reducing station. The energy that is released by the existing station will be used to generate hydropower sent to the grid through a PG&E interconnection. The water used to generate the hydropower will not result in any change in water diversions.

Reference Number: 3860-P84-1137

Implemented By: The Sierra Fund

Objective: Project will help local public agencies to meet long-term water supply needs, protection of water quality, and augment/restore environmental conditions.

Type: Infrastructure Improvement

Total Cost: $3,343,603.99

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 4/30/2019    Actual Completion: 6/30/2017

Associated Counties: El Dorado, Nevada, Placer, Sierra, Yuba

Located In Disadvantaged Community: Yes

Contribution SourcesContribution DateContribution Amount
  $3,343,603.99
Local Contribution2/12/2014$2,963,604.00
Prop. 84, Integrated Regional Water Management2/12/2014$379,999.99


Project MetricMetric TopicQuantityUnit
Infrastructure ImprovementOther  

Location

loading loading