Project: Devil’s Gate and Eaton Stormwater Flood Management Project

Description: Project improvements include: 1) restoring reservoir capacity at Devil’s Gate Reservoir by removing sediment; 2) improving seismic performance and operational capabilities, and constructing a new toe drain and erosion protection measures at Eaton Wash Dam; 3) enlarging and enhancing operations of the Eaton Wash Spreading Grounds; and 4) a pipeline will be constructed to provide a connection from the Devil’s Gate Dam and Reservoir to the Eaton Wash facilities.

Reference Number: 3860-P1E-593

Implemented By: Los Angeles County Flood Control District

Objective: Manage stormwater runoff to reduce flood damage and where feasible, provide other benefits, including groundwater recharge, water quality improvement, and ecosystem restoration.

Type: Water Management

Total Cost: $75,034,935.00

Project Status: Project Implementation

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 12/31/2022    Actual Completion:

Associated Counties: Los Angeles



Contribution SourcesContribution DateContribution Amount
  $75,034,935.00
Local Contribution9/20/2013$46,657,603.00
Prop. 1E, Stormwater/Flood Management9/20/2013$28,377,332.00


Project MetricMetric TopicQuantityUnit
Water ManagementStormwater Flood / Capture  