Project: Runnymede Storm Drain Phase II and O’Connor Pump Station Outfall Project

Description: The project will excavate and widen the South Channel along the length of the project, and excavate an existing detention basin at the southern end of the project area to increase stormwater flow and retention capacity. Excavated soil will be used to create a small berm on the western side of the South Channel and detention basin. The project will also repair the O'Connor Pump Station outfall structure.

Reference Number: 3860-P1E-589

Implemented By: City of East Palo Alto

Objective: Manage stormwater runoff to reduce flood damage and where feasible, provide other benefits, including groundwater recharge, water quality improvement, and ecosystem restoration.

Type: Water Management

Total Cost: $1,527,508.00

Project Status: Complete and Fully Paid

On Time?: Yes    Within Scope?: Yes    Within Budget?: Yes

Estimated Completion: 3/31/2017    Actual Completion: 7/10/2018

Associated Counties: San Mateo



Contribution SourcesContribution DateContribution Amount
  $1,527,508.00
Federal Contribution9/20/2013$859,555.00
Prop. 1E, Stormwater/Flood Management9/20/2013$667,953.00


Project MetricMetric TopicQuantityUnit
Water ManagementStormwater Flood / Capture  